The stages of erecting a wind turbine |
Construction of a wind farm
1 - Reinforcement of the foundation
|
2 - Installing an anchorage system
|
3 - Putting in place a control
box and monitoring console
|
4 - Installation of the first section
|
5 - Installation of the second section
|
6 - Positioning the nacelle
|

7 - Transport of the blades
|

8 - Preparing the blades
|

9 - Preparing the hub
|

10 - Assembly of the 3 blades
|

11 - Lifting the rotor (1)
|

12 - Lifting the rotor (2)
|

13 - Fixing the rotor (1)
|

14 - Fixing the rotor (2)
|

15 - Erecting finished
|
|